Our Blog
Case Study: Centerline Layout Or “Why did the chicken cross the road?”
Last Fall, we had the opportunity to watch a crew of experienced local pavement marking contractors at work in our local Metroparks after a full repave of one of the parkways. Miguel, the crew [...]
Case Study: First Use of Glass Beads
Members of the Cleveland Skating Club had noticed that traffic speeds on a small connector road between its front and rear parking lots were gradually increasing. RoadPrintz volunteered to paint a SLOW marking to [...]
Case Study: Euclid Avenue Turn Arrows Repainting
Euclid Avenue in Cleveland, Ohio, is a major thoroughfare. Its modern streetscape includes BUS ONLY lanes and painted bike lanes in each direction throughout most of its length. Most signalized intersections also include left [...]
Case Study: AsiaTown Bike Lane
RoadPrintz, worked in conjunction with a number of groups and organizations, including the City of Cleveland, Downtown Cleveland Residents, AsiaTown Advisory Committee, MidTown Cleveland Inc., Campus District, Clevelanders for Public Transit, Bike Cleveland, and [...]
Case Study: EV Parking Space
Sed porttitor lectus nibh. Nulla quis lorem ut libero malesuada feugiat.






